Infrastructure
Data center — design, delivery and configuration
From the LAN to the data center: sizing, delivery and commissioning, with backup and a continuity plan.
Who it is for
Companies growing out of a server room or moving load into a controlled data center.
The problem
Uneven hardware sizing, weak power/cooling headroom, backups that are never tested.
What is included
- Capacity and topology design
- Server and network supply and configuration
- Backup and a basic DR frame
- Optional move onto Managed IT
What is not included
- Civil fit-out of a colo hall outside the IT scope
- Third-party software licences outside the quote
How implementation looks
Load and growth requirements, then specification, procurement, install, failover test.
Integrations
VPN, monitoring, backup targets, identity. Existing vendor ecosystems are fine.
Security and operations
Physical and logical access, segmentation, change records.
Support
After handover — Managed IT, or vendor warranty plus our incident support.
Questions from sales conversations
Do you only do Dell/Cisco?
That stack is common, but the spec follows the requirement, not a catalogue.
Can gear stay on our site?
Yes. Colo / our data center is an option when it carries risk better.
What about AI hardware?
For Private AI we size GPU nodes as part of the same infrastructure project.
Next step