Infrastructure

Data center — design, delivery and configuration

From the LAN to the data center: sizing, delivery and commissioning, with backup and a continuity plan.

Who it is for

Companies growing out of a server room or moving load into a controlled data center.

The problem

Uneven hardware sizing, weak power/cooling headroom, backups that are never tested.

What is included

  • Capacity and topology design
  • Server and network supply and configuration
  • Backup and a basic DR frame
  • Optional move onto Managed IT

What is not included

  • Civil fit-out of a colo hall outside the IT scope
  • Third-party software licences outside the quote

How implementation looks

Load and growth requirements, then specification, procurement, install, failover test.

Integrations

VPN, monitoring, backup targets, identity. Existing vendor ecosystems are fine.

Security and operations

Physical and logical access, segmentation, change records.

Support

After handover — Managed IT, or vendor warranty plus our incident support.

Questions from sales conversations

Do you only do Dell/Cisco?

That stack is common, but the spec follows the requirement, not a catalogue.

Can gear stay on our site?

Yes. Colo / our data center is an option when it carries risk better.

What about AI hardware?

For Private AI we size GPU nodes as part of the same infrastructure project.

Next step

Request an infrastructure quote